Contents: Removal ↡ Installation ↡
Removal
1. Remove the generator 1 (see figure 3.47).
Figure 3.47. Valve for checking the amount of air supplied:
1. Generator,
2. Clamp,
3. Check valve,
4. Vacuum tube,
5. Bolt,
6. Intake manifold,
7. Compaction.
2. Disconnect the tube from the test valve 3. Replace the clamp 2.
Original published on the website [MERCEDESMAN.ru]
3. Disconnect the vacuum tube 4.
4. Unscrew bolts 5 securing test valve 3.
5. Remove the test valve 3. Replace the seal 7.
Installation
6. Installation is carried out in the reverse order of removal.
