Contents: Removal ↡ Installation ↡
Removal
1. Remove refrigerant from air conditioning systems.
2. Remove the compressor.
3. Remove the retaining ring 1 (figure 8.18).
4. Remove electromagnetic clutch 2.
Installation
5. Installation is carried out in the reverse order of removal.
Figure 8.18. Air conditioning compressor electromagnetic clutch: 1 - Retaining ring; 2 - Air conditioning compressor electromagnetic clutch; 3 - Wiring connector.
