Contents: Removal ↡ Installation ↡
Removal
Generator Drive Belt Installation Details
1. Loosen the fan shroud and secure it over the fan.
2. Remove the fan clutch.
3. Loosen the alternator drive belt.
4. Unscrew the nut (378), bolt (375) and remove the generator drive belt.
5. Check the belt for damage.
Installation
Alternator Drive Belt Routing Diagram
1 - Tension roller; 2 - Crankshaft; 3 - Air conditioning compressor; 5 - Generator; 7 - Power steering pump; 7/1 - Guide roller; 8 - Cooling system pump
Installation is carried out in the reverse order of removal. Belt length: without air conditioning - 2080 mm, with air conditioning - 2145 mm.
[Information copied from the website MercedesMAN.ru]
