Details of installation of the valve of adjustment of clearance of a body
50 - Distribution valve
52 - Distributor
54 - Connecting rod
Y36 - body height adjustment valve
Removing
1. Remove the front right wheel.
2. Remove three bolts (arrows) and remove the shield (a) on the right wheel arch.
3. Disconnect the discharge pipe (R) from steel tube. Drain the liquid.
4. Disconnect the connecting rod (54) from the lever on the regulator (6).
5. Remove-valve (Y36), having removed the valve clamp, disconnect the wiring connectors from the valves (Y36) And (Y37).
6. US models: Disconnect tie rod (15) from the lever on the regulator (6).
7. Turn away bolts of fastening (52c), lift the control valve (50) from distributor (52) and carefully remove it.
8. Remove the bolts (50e), disconnect the valve (Y36) from distributor (50).
Installation
Installation is carried out in the reverse order of removal.
Always replace o-rings.
Before installation, wipe the sealing surfaces and all parts. Check that the O-rings are installed correctly.