Details of installation of the control panel for the operation of heating / ventilation / air conditioning systems
1 — Facing overlay of console section of the panel of devices
1. Installation details of the heating / ventilation / air conditioning control panel are shown in the illustration, to which all references in the text refer.
2. Remove the radio (see chapter Body).
3. Turn out fixing bolts and release the control panel (4) from the console section of the instrument panel. Remove the control handles.
4. Disconnect drive cables (2 and 3).
5. Disconnect the connector (Х72/3) and remove the control panel (4).
6. Installation is carried out in the reverse order.